Abstract
The demand for infrastructure remains high in China. In order to meet this demand under conditions of limited government funding availability, local governments have increasingly sought private participation through ‘public, private partnerships’ (PPPs). While PPPs are recognised as a reliable mode for delivering infrastructure projects, agency problems are also known to interfere with their success. The nature of these agency problems, along with the types of partnership arrangements under which they occur, is the subject of this research. Semi-structured interviews were conducted with PPP consultants working on infrastructure projects in China. Results suggest that opportunistic behaviour is to be found both within the private sector and within the government sector. While the private sector is shown to take advantage of ‘information asymmetries,’ the government sector is shown to allocate project risks and responsibilities disproportionately in their favour. Results also indicate that PPP arrangements between local government and ‘state owned enterprises’ (SOEs) were less prone to agency abuse, while agency problems in PPP arrangements between local government and private firms were relatively greater.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
References
Amagoh F (2009) Information asymmetry and the contracting out process. Innov J 14(2):1–14
Bloomfield P (2006) The challenging business of long term public-private partnerships: reflections on local experience. Public Adm Rev 66(3):400–411
Buxbaum JN, Ortiz IN (2009) Public sector decision making for public-private partnerships, vol 391. Transportation Research Board
De Palma A, Prunier G, Leruth L (2009) Towards a principal-agent based typology of risks in public-private partnerships, vol 9. International Monetary Fund
Greiling D (2009) Public private partnerships—a driver for efficient public services or just an example of wishful thinking. Zeitschrift für öffentliche und gemeinwirtschaftliche Unternehmen, Beiheft 37:108–125
Guasch JL, Laffont JJ, Straub S (2008) Renegotiation of concession contracts in Latin America: evidence from the water and transport sectors. Int J Ind Organ 26(2):421–442
Hart O (2003) Incomplete contracts and public ownership: remarks, and an application to public private partnerships. Econ J 113(486):C69–C76
Kumar M (2009) Institutional and regulatory economics of public private partnerships in infrastructure: evidences from stochastic cost frontier analysis and three case studies of urban water utilities. The George Washington University, Washington, DC
Laffont JJ, Martimort D (2002) The theory of incentives: the principal-agent model. Princeton University Press, Princeton
Mu R, de Jong M, ten Heuvelhof E (2010) A typology of strategic behaviour in PPPs for expressways: lessons from China and implications for Europe. EJTIR 10(1):42–62
Oudot JM (2005) Risk-allocation: theoretical and empirical evidences, application to public-private partnerships in the defense sector. Paper presented at the 9th annual conference of the institutions of market exchange, Barcelona, Spain
Shrestha A, Aibinu AA, Chan TK, Chen C (2013) Risk allocation in public private partnerships in China’s water projects: a principal agent approach. In: Brebbia CA (ed) Water resources management VII. WIT Press, Southampton
Spiller PT, Savedoff W (1999) Government opportunism and the provision of water. Spilled water: an institutional commitment to the provision of water services. Inter-American Development Bank, Washington, DC
Strauss AL, Corbin JM (1990) Basics of qualitative research: grounded theory procedures and techniques. Sage Publications, Thousand Oaks
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2015 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Shrestha, A., Martek, I. (2015). Principal Agent Problems Evident in Chinese PPP Infrastructure Projects. In: Shen, L., Ye, K., Mao, C. (eds) Proceedings of the 19th International Symposium on Advancement of Construction Management and Real Estate. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-662-46994-1_62
Download citation
DOI: https://doi.org/10.1007/978-3-662-46994-1_62
Published:
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-662-46993-4
Online ISBN: 978-3-662-46994-1
eBook Packages: Business and EconomicsBusiness and Management (R0)